NTPC Recruitment 2020

APPLY ONLINE FOR Engineering Executive Trainees Through GATE & For Experienced Professional in the area of Mining:

ntpc

Recruitment Of Engineering Executive Trainees Through GATE-2020

IMPORTANT DATE:

  • Opening date for online registration: 16.06.2020.
  • Closing date for online registration: 06.07.2020.

Age Limit:

  • Upper Age Limit is 27 Years as on last date of online application.
  • Age relaxation as per applicable rule.

Application Fee:

  • Candidate belonging to General/EWS/OBC category is required to pay a non-refundable registration fee of Rs. 150/-
  • The SC/ ST/ PwBD/ XSM category candidates need not pay the registration fee.

Qualification:

  • Full time Bachelor’s Degree in Engineering or Technology/AMIE.

Vacancies:

Engg. DisciplineVacancies
Electrical Engineering30
Mechanical Engineering45
Electronics/ Instrumentation25

Interested candidates can read the full notification before applying for the job.


Apply For Experienced Professional in the area of Mining:

IMPORTANT DATE:

  • Opening date for online registration: 02.06.2020.
  • Closing date for online registration: 22.06.2020.

Age Limit & Vacancy:

Name of the PostTotal No. of
Vacancies
Upper Age Limit
Head of Excavation0152 years
Executive (Excavation)0147 years
Executive (Mine Planning- RQP)0247 years
Head of Mine Surveyor0147 years
Asst. Mine Surveyor / Mine Surveyor1837 years for Asst. Mine Surveyor & 42 years for Mine Surveyor

APPLICATION FEE:

  • General, EWS, and OBC candidates are required to pay a nonrefundable non-transferable application fee of Rs 300/- (Rs. Three Hundred only).
  • SC/ ST/ XSM category candidates need not pay the registration fee.

Education Qualification:

  • Diploma in civil, mining and mine survey.
  • Engineering degree in Mechanical/ Mining Machinery.
  • Post Graduate Degree in Geology/ Applied Geology.

Interested candidates can read the full notification before applying for the job.

About NTPC:

NTPC (National Thermal Power Corporation) Limited, India‚Äôs largest power conglomerate with an installed capacity of 62,110 MW and is presently contributing to 1/4th of the country’s electricity needs. Commensurate with our country’s growth challenges, NTPC has embarked upon an ambitious plan to attain a total installed capacity of 130 GW by 2032. NTPC has been allocated 10 coal mine blocks which are expected to produce more than 100 million tons per annum.

Leave a Reply